Design, engineering and permits from one office.

We draw homes, ADUs and additions across Los Angeles and Ventura County — and stamp the structural and civil engineering ourselves, so your set clears plan check without a second consultant and a second schedule.

ESTABLISHED
2017 · Agoura Hills
DISCIPLINES
Design · Structural · Civil
JURISDICTIONS
LA County · Ventura County

Most residential projects stall between the drawing and the permit.

A designer draws it. A structural engineer is hired later and changes the framing. A civil engineer is hired after that and the grading forces the pad to move. Every handoff costs a month, and plan check finds the seams.

M&N Home Design was set up in 2017 to hold all three in one office. The person responsible for whether the house stands up is in the room when it is designed, which is why the drawings that leave here tend to survive the first correction letter.

How a project runs

Home design

Feasibility, schematic design, design development and the full permit set — plans, elevations, sections, details and Title 24 compliance.

Home design

Structural engineering

Lateral and gravity design, foundations, retrofits and calculations stamped by a California PE. No second consultant, no scheduling gap.

Structural engineering

Civil engineering

Grading and drainage plans, retaining walls, earthwork quantities and erosion control — the work that decides whether a hillside lot is buildable.

Civil engineering

Selected work

All 22 projects
A two-storey detached accessory dwelling unit in Venice, California designed by M&N Home Design

Accessory dwelling units

California law now obliges most cities to approve a compliant ADU, and to do it within 60 days of a complete application. The difficulty has moved: it is no longer whether you are allowed to build one, it is whether your set is complete on the day it is submitted.

We design detached ADUs, garage conversions and junior ADUs, and we run the submittal ourselves. Setbacks, fire separation, the Title 24 package, the utility connections and the drainage all get resolved before the drawings go in, not after the correction letter.

From first call to approved permit

  1. PHASE 01

    Feasibility

    Zoning summary, buildable envelope, options sketch

  2. PHASE 02

    Schematic design

    Floor plans, elevations, 3D views

  3. PHASE 03

    Construction documents

    Permit set, structural calcs, Title 24

  4. PHASE 04

    Plan check

    Submittal, corrections, resubmittal to approval

  5. PHASE 05

    Construction support

    RFIs, revisions, site coordination

Fees are fixed per phase and quoted before the phase starts. You are told what the next stage costs before you commit to it.

Send us the address.

Tell us the property and roughly what you want to build. We come back with what the zoning allows, the likely permit path for that jurisdiction, and a fixed fee for the first phase. No charge for that.